Obra John Deere
Projeto New Shipping
Project overview
The New Shipping Project, developed for John Deere in Horizontina, Rio Grande do Sul, required execution marked by technical precision, strong infrastructure work, and integration across different construction systems.
Construcione carried out the project with a focus on performance, execution control, and compliance with the specific requirements of the automotive and auto parts segment.
Project dimensions
- 8,000 m² – Built area
- 400 m³ – Rock excavation
- 70,000 m³ – Earthfill
- 460 m – Retaining wall
- 35,000 m² – External paving
Scope of work
- Executive projects
- Rock excavation, earthfill, and foundations
- Precast and steel structures with FM Global standards
- Fire protection, electrical, and hydraulic installations
- Substation, paving, and finishes
The project reinforces Construcione’s ability to operate in projects with high infrastructure demands, construction control, and integration across disciplines, delivering solidity, efficiency, and reliability for complex industrial operations.