Project FS Bioenergia
Partial Implementation of the Corn Ethanol Production Facility
Project overview
The partial implementation of FS Bioenergia’s industrial unit in Primavera do Leste, Mato Grosso, required broad and highly coordinated technical execution.
Construcione carried out multiple work fronts with a focus on construction precision, integration between systems, and support for a highly complex industrial operation.
Project dimensions
- 15,200 m³ – Concrete
- 750 tons – Steel
Scope of work
- Execution of industrial bases and process areas
- Construction of industrial, technical, and administrative buildings
- Deep and shallow foundations
- Cast-in-place, precast, and steel roof structures
- Fire Protection Systems
- Electrical and hydraulic installations
- Paving
- Internal and external finishes
This delivery reinforces Construcione’s ability to operate in industrial projects with a high level of technical demand, coordination across multiple disciplines, and consistent execution control.
A project developed to support performance, operational reliability, and construction solidity.
