Project Brevini
New Production Unit Implementation
Project overview
The implementation of Brevini’s new production unit in Limeira, São Paulo, was conducted by Construcione with a focus on construction performance, integration between disciplines, and strong execution control. With 7,000 m² of built area, the project brought together different work fronts in a complete scope, focused on operational efficiency and delivery solidity.
The execution covered everything from site preparation to final finishes, with careful technical coordination at every stage. The result is an industrial structure completed with consistency, construction quality, and alignment with the project’s requirements.
Project dimensions
- 7,000 m² – Built area
Scope of work
- Earthworks
- Precast structures
- Paving
- Hydraulic and mechanical installations
- High-quality finishes
The project reinforces Construcione’s ability to operate in medium and heavy industrial complexes with an integrated vision, technical precision, and commitment to excellence in every delivery.
