Project LDC
Aerobic and Anaerobic System
Project overview
The civil execution of LDC’s Aerobic and Anaerobic System project, in Bebedouro, São Paulo, brings together highly demanding technical work fronts and direct interface with the industrial operation.
Construcione is conducting the project with execution precision, field control, and integration between infrastructure, buried systems, and construction finishes.
Project dimensions
- 150,000 m³ – Cutting and spreading of 1st and 2nd category material
- 80,000 m³ – Earthfill
- 25,000 m³ – Soil importation
- 70,000 m² – Waterproofing with geomembranes
- 6,000 m – Buried HDPE pipes
Scope of work
- Concrete structures
- Industrial floors and enclosures
- Electrical and hydraulic installations
- Internal and external finishes
- Civil execution integrated with aerobic and anaerobic systems
The project highlights Construcione’s ability to operate in projects with a high volume of earthmoving, specific technical systems, and a high level of execution coordination, supporting performance, construction safety, and operational reliability.