Project John Deere
B6 Building Expansion and B2 Building Adaptation
Project overview
The expansion of John Deere’s B6 Building and the adaptation of the B2 Building, in Montenegro, Rio Grande do Sul, involved a delivery focused on execution precision, industrial floor performance, and integration between different construction systems.
Construcione conducted the project with attention to the client’s operational requirements and the technical criteria of the operation.
Project dimensions
- 7,300 m² – Built area
- 3,000 m² – External paving
- Internal floor specification with FF/FL 80/80 for trilateral forklifts
- Average results achieved: 114/102
Scope of work
- Deep and shallow foundations
- Precast and steel roof structures
- Fire protection systems and electrical and hydraulic installations
- Paving and internal and external finishes
The project reinforces Construcione’s ability to operate in industrial expansions and adaptations with execution control, attention to construction performance, and technical precision applied to the specific requirements of the operation.